Vesgantti Full Size Mattress Hybrid Full Mattress in a Box
Vesgantti Full Size Mattress Hybrid Full Mattress in a Box - Twin / 9 inch is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Description
Description
- Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Vesgantti Luxury Support System: Luxury multi-layer foam and pocket spring support system not just provides better support for your body, but also can absorb more pressure come from your body and the spring, providing more buffers for your body. Fully relax your muscles, greatly improve your sleeping quality
- Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, comfortable and breathable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
- Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
- Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, restore in 10 seconds after unpacking. Please note: once the mattress open and restore, it cannot be roll back again
Product Description
Payment and Refund
Payment and Refund
We are dedicated to providing a smooth and reliable shipping experience. If you have any questions or concerns regarding our shipping policy, please do not hesitate to reach out to our customer support team for assistance. Your satisfaction is our priority.
Order Confirm
A confirmation email will be sent to you once the order needs authorization. We begin preparing your order immediately after it is verified. With this sort of time frame, it makes it difficult for us to change or cancel your order, however, we will do our best to support your request.
Order Cancellation
We will NOT accept order cancellation request if the orders have been shipped. Please apply for a return after receiving the package.
Processing
It usually takes 3-5 business days for your order,while some items may take longer than expected.
Please note:
- Total Delivery Time = Processing Time + Shipping Time
- Please note that the actual delivery time of pre-sale products may be delayed. If you mind the shipping time, thank you for your patience and understanding. If you mind, please place your order with caution.
- All estimated/typical delivery time are derived from real world data collected from past orders. They are approximate times for reference only.
- Shipping times will be affected during public holidays; manufacturers and couriers will limit their operations at these times. This is outside our control. Normal service resumes immediately after each holiday.
- What will happen if I refuse to accept my delivery?If the order is returned to us, once we have received it, we will refund 50% of your payment to you.
How to Track Your Order
After you place your order, we'll take 1-2 business days to confirm and arrange delivery. Once your shipping information is confirmed, we'll send you an email with your order tracking number and delivery updates. You can also track the progress of your order using the "Track My Order" feature on our website.
Note for taxes
Our customers do not need to pay for importing fees, duties or VAT(Valued Additional Tax). However, some limited countries (especially for some European countries such as Germany, Italy, UK and Canada,etc.) may need to pay duties or VAT according to your countries’ levying rules.
Contact Us
If you have any further questions, please contact our customer services at help@meedenart.com.
1. Pay With Paypal
When you place an order with Paypal you will be redirected to the PayPal payment page, where you can confirm your payment by logging in with your PayPal username and password.
If you are already a PayPal customer, you can log in with your user data and make a payment. You may still check out even without a PayPal account. To do so, please click on "Pay with Debit/Credit Card" and you’ll be redirected to a secure page where you can enter your credit card information or complete your payment safely via PayPal.
2. Pay With Credit/Debit Card
The credit card companies listed above are the most commonly used credit cards on this website. Please note that Dripex does not collect your credit/debit card number or personal information when you make a payment. For questions regarding your transactions on our site, please consult your card-issuing bank for information.
Delivery and Shipping
Delivery and Shipping
Free Shipping Now
Dripex has implemented a strategic shipping approach where products are dispatched from the warehouse closest to the customer's designated shipping address.
This method aims to minimize delivery time and optimize the overall shopping experience.As part of our commtment to delwering excptionalsenvice,we guarante that no supplementary fees will be incurred for this expedited shipping service.
Shipping Methods and Shipping Time:
Shipping Methods | Working Time | Delivery Time |
FedEx Ground | Mon. To Fri. |
3-7 days |
FedEx Home | Mon, To Sun. | 4-7 days |
LTL(Apply for extra Large Time | Mon. To Fri. | 5-14 days |
Delivery to States(A-Z):
Alabama, Arizona, Arkansas, California, Colorado, Connecticut, Delaware, Florida, Georgia, Idaho., Illinois, Indiana,Iowa, Kansas, Kentucky, Louisiana, Maine, Marland,Masachuselts, Michigan, inesote,Misisipp, Misour, Montang, Nebraska,Nevado,New Hampshire,New Jersey,New Mexico,New York Norh caroin,North,Dakota, ohio.Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, South Dakota, Tennessee, Texas, Utah.
Important Notice:
Note l: In the case of purchasing a pre-sale product, please note that the item will be shipped within 48 hours once it becomes available in stock
Note 2: We would like to inform you that shipment dates provided for all orders are estimates. Delays may occur due to unforeseen circumstances beyond our control, suchas force majeure events, natural disasters, inclement weather, war, public holidays, and other factors. lf you have any inguirnies or require the latest information, please do not hesitate to contact us at dripex669@gmail.com